Preliminary Assessment

The 5% of substations that place the greatest strain on your grid

Start with the data you already have: your substations ranked by impact and the quantified potential for optimizing your network—without installing anything. The preliminary assessment is free and requires no commitment.

01

Describe your network

Some key metrics: number of substations, temperatures, peak demand, and generation sources.

02

Please attach your data

All you need is an export of your meter readings: the energy and volume readings for each substation and each injection point. Don't have a file ready? Start with the Excel template.

03

Your substations, ranked by impact

Cooling, pumped volume, power demand, specific consumption: the 5% that most significantly degrade grid performance top the list.

04

The Quantified Potential

Return temperatures, heat loss, pumping, peak demand: You’ll receive an estimate of potential savings and the first steps to take.

Free, with no obligation, and your data is protected

The preliminary assessment does not commit you to anything. Your data is used solely for preliminary analysis and to improve the analytical model. After the presentation, it will be deleted upon request via email.

Privacy Policy →

No file ready?

The Excel template lists the relevant data, with sample entries and automatically calculated metrics. Enter whatever information you have—even just some of it is enough to get started.

Download the Excel template →

Request a preliminary assessment

Free and with no obligation. Fields marked with * are required.

Sources of production

Available Data

Your Priorities

Attach an export of your meter readings or the completed Excel template. Minimum required: the energy and volume readings for each substation and each injection point (generation), recorded at the beginning and end of the period. Excel or CSV format, 10 MB maximum. Don’t have a file on hand? The form alone is enough to get started.

Your data will be used solely for preliminary analysis and to improve the analytical model. After the presentation, it will be deleted upon request via email.

Maximum file size: 10 MB.
Uploading...
fileuploaded.jpg
Upload failed. The maximum file size is 10 MB.
Thank you!
Your request has been received by Dyneo.

Follow Dyneo's news on LinkedIn
An error has occurred. Please fill in the required fields and try again.

They operate their networks using Dyneo

  • Veolia Logo – Dyneo Client
  • Romande Energie Logo – Dyneo Client
  • SIEL42 Logo – Dyneo Client
  • Val-de-Ruz Municipality Logo – Dyneo client
  • Genolier Logo – Dyneo Client
  • CADouest Logo – Dyneo Client
  • CADcime Logo – Dyneo Client
  • Viteos Logo – Dyneo Client
  • SIL Logo, Lausanne Industrial Services – Dyneo client
  • Edifea Logo – Dyneo Client