Case study

1

-

Lowering temperatures

As part of its decarbonization strategy, our customer needs to lower the temperature of its thermal network to integrate more renewable heat sources (heat pumps, waste heat recovery, solar thermal). To achieve this, he needs a better understanding of substation dynamics to optimize energy efficiency while keeping investment costs under control.

Challenge

Our customer was faced with several major constraints:
- Lack of digitization: Its network was operating without a precise monitoring system, making any optimization complex.
- Limited control of substations: Lack of visibility of heat exchanger performance hampered any necessary adjustments.
- Limited budget and deadlines: A fast, cost-effective solution was needed, without heavy intervention on the existing infrastructure.

Solution

We deployed a retrofit technology enabling immediate network modernization, without costly equipment replacement. Thanks to a progressive, industrialized approach, we were able to ensure an effective digital transition in just a few weeks for several dozen substations.

Project milestones :

Network diagnostics: Identification of critical substations and optimization opportunities.
Deployment of IoT systems: Rapid installation of M2M gateways for continuous, accurate data collection without service interruption.
Implementation of a cloud platform: Centralization and real-time analysis of consumption data, temperatures and thermal efficiencies.
Reliable analyses: Implementation of models to characterize heat exchange and assess the impact of temperature reduction.
Progressive optimization: Dynamic temperature adjustments to maximize energy efficiency and integrate new heat sources.

Results

Analysis of SSTs to be optimized in order to achieve lowering targets without exchanger replacement.
Improved energy efficiency thanks to continuous optimization of settings.
Reduced operating and maintenance costs by limiting equipment wear and tear and avoiding premature replacement.
Accelerated deployment: A digital transformation completed in 4 weeks, without any major work.

By adopting a turnkey digital retrofit strategy, our customer was able to improve the reliability and performance of its network while reducing its carbon footprint. A key solution for network operators wishing to accelerate their energy transition without heavy investment.

Would you like to modernize your thermal network without any additional costs or interruptions? Contact us now for a personalized diagnosis!